First a site needs to be identified (see previous questions). If required, mast/pole needs to be mounted. Afterwards, the WiBACK Node(s) and the antennas can be mounted. If needed, solar-cell, battery and charge-controller can be deployed as well. As a final the antennas needs to be pointed.